Motorola VC5090 Especificações Página 61

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 60
Installation 2 - 33
Figure 2-48
Connecting UPS to PCB
5. Place the UPS/Memory Card door over the UPS and secure using the eight new screws.
6. Torque the screws to 9 ± 0.5 kgf/cm (7.8 ± 0.4 in-lbs).
7. Place the Main Power switch to the on position.
The UPS fully charges in approximately four hours.
CAUTION Ensure that you torque the screws to seal the device properly. Otherwise, sealing can be compromised.
Vista de página 60
1 2 ... 56 57 58 59 60 61 62 63 64 65 66 ... 257 258

Comentários a estes Manuais

Sem comentários