
© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Public
BRKUCC-2617
109
Site Survey
• Before deploying the Cisco Cius into a production environment, a site survey must be
completed by a Cisco certified partner with the advanced wireless LAN specialisation.
• During the site survey the RF spectrum can be analysed to determine which channels
are usable in the desired band (2.4 GHz or 5 GHz). Typically there is less interference in
the 5 GHz band as well as more non-overlapping channels, so 5 GHz is the preferred
band for operation and even more highly recommended when the Cisco Cius is to be
used in a mission critical environment.
• The site survey documentation will include heatmaps showing the intended coverage
plan for the location.
• Access point platform, antenna, access point configuration (channel and transmit power)
information to use at the location will also be included in the site survey documentation.
• Refer to the Steps to Success website for additional information.
http://www.cisco.com/go/stepstosuccess
Comentários a estes Manuais