Hardware Preparation and Installation
CPCI-6200 Installation and Use (6806800J66C)
40
5. Remove the filler panel from the appropriate card slot.
6. Set the VIO on the backplane to either +3.3 V or +5 V, depending on your
CompactPCI system signaling requirements, and ensure the backplane does not
bus J3 or J5 signals.
7. Slide the baseboard into the appropriate slot.
Grasping the top and bottom injector handles, be sure the module is well seated in
the P1 through P5 connectors on the backplane. Make sure you do not damage or
bend connector pins.
8. Secure the baseboard in the chassis with the screws provided, making good
contact with the transverse mounting rails to minimize RF emissions.
9. Replace the chassis or system cover(s), and make sure no cables are pinched.
10.Cable the peripherals to the panel connectors, and then reconnect the system to
the AC or DC power source.
11.Turn the equipment power on.
After you have verified that all necessary hardware preparation has been done, that all
connections have been made correctly and that the installation is complete, you can power up
the system. The MPU, hardware and firmware initialization process is performed by the
MOTLoad power-up or system reset. The firmware initializes the devices on the baseboard in
preparation for booting the operating system.
The firmware is shipped from the factory with an appropriate set of defaults. In most cases
there is no need to modify the firmware configuration before you boot the operating system.
For more information on MOTLoad, see MOTLoad Firmware on page 95.