Motorola SG4-DRT-2X Instruções de Operação Página 31

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 108
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 30
Bench Setup and Operation 3-3
SG4000 Installation and Operation Manual
Forward Path Configuration
The following subsections present information to help you configure the forward path of the
SG4000.
To configure the forward path, you must install configuration-specific boards in forward
configuration board locations 1 and/or 4, as illustrated in Figure 3-3.
Figure 3-3 illustrates the SG4000 and identifies the location of all major forward-path
components.
Figure 3-3
SG4000 showing major forward-path components
Forward
configuration
board
location #1
Forward
configuration
board
location #4
Receiver
Forward RF
-20 dB
test point
Forward RF
-20 dB
test point
Receiver
Forward
JXP
attenuator
Forward
JXP
attenuator
Vista de página 30
1 2 ... 26 27 28 29 30 31 32 33 34 35 36 ... 107 108

Comentários a estes Manuais

Sem comentários