Motorola SG4-DRT-2X Instruções de Operação Página 45

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 108
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 44
Bench Setup and Operation 3-17
SG4000 Installation and Operation Manual
8
Position jumper J5 as required for the number of active outputs you are using.
In a typical installation, the RF modules in Ports 1 and 3 are connected to the forward
redundant segmented 2X board in configuration location 1. The RF modules in Ports 4 and 6
are connected to the forward redundant segmented 2X board in configuration location 4.
9 Ensure that the PIC cable is properly connected to the lid router board and center power
distribution board in the node base.
10 Ensure that the SIC cable is properly connected to the EPIM and center power distribution
board in the housing base, as illustrated in Figure 3-14.
11 Move the jumper on the EPIM board from the SW1 auto to the SW1 a position, thereby
disabling receiver two. See Section 4, “Modules,” Embedded Plug-in Module for detailed
information on the switch and jumper settings.
12 Route the fiber service cable into the node and fiber tray.
13 Measure the optical input power on the primary and secondary forward pigtails leaving
enough length to connect them to the receiver bulkhead connectors.
14 Apply power to the node (see Powering the Node in this section). Allow five to ten seconds
for the system self-diagnosis to complete.
15 Connect the service cable to the primary and secondary SG4-R/* bulkhead connectors.
16 Verify that the green LED (ON), located on the top panel of the SG4-R/* in lid optics slot 1, is
illuminated to confirm enable status.
17 Using a voltmeter, test the optical input power to receiver one.
Figure 4-2 illustrates the optical power test point on the top panel of the SG4-R/* receiver.
The scaled voltage at this test point is 1.0 V/mW.
18 Measure the RF output level at the primary receiver 20 dB test point using an RF meter.
For 0 dBm (1.0 mW) input, the receiver output level is approximately 26 dBmV at 870 MHz.
Other output levels are presented in Table 4-2.
19 Select a JXP-* pad from Table 2-2. Insert it into the receiver pad facility.
20 Check all 20 dB test points on SG4-RF modules on the left side of the node.
These modules are connected to the forward redundant segment 2X board in forward
configuration location 1.
21 Determine how much output (excess or shortage) is present at the port with the lowest level
and insert the necessary pad into the receiver pad facility of receiver 1.
22 If necessary, adjust level variances between output ports by placing a pad at the particular
output pad position.
23 Move the jumper on the EPIM to the SW1 B override position, which turns receiver 1 off. The
red fault LED indicator on receiver 1 and the green enable LED on receiver 2 should
illuminate.
24 Repeat Steps 18 through 22 and verify that the node output levels are the same as the
primary receiver. Adjust the secondary receiver output pad only; do not re-adjust any output
padding in the RF modules.
25 Move the jumper on the EPIM board back to the SW1 AUTO position.
Vista de página 44
1 2 ... 40 41 42 43 44 45 46 47 48 49 50 ... 107 108

Comentários a estes Manuais

Sem comentários