Bench Setup and Operation 3-43
SG4000 Installation and Operation Manual
Power Supply Operation
You can power the SG4000 from 60 VAC or 90 VAC system supplies. The SG4000 power supply
module is auto-ranging and requires no start-up voltage jumper selection. The power supplies
begin to operate when the proper input voltage level of 44 VAC rms is reached; they continue to
operate until the input voltage drops below 39 VAC. The line frequency must be 50 Hz or 60 Hz,
and the input voltage waveshape must be quasi-squarewave.
CAUTION!
Damage to the power supply may result from the use of sine wave input power. There are no user-serviceable parts
within the SG4-PS power supply.
The power supply features a self-protection attribute that shuts it down for instantaneous line
voltages higher than 176 VAC. A precision output regulator protects against overcurrent and
short circuits, thus providing a precise output voltage.
Figure 3-39
SG4-PS power supply
NO USER SERV IC
A
BLE P
A
RTS INSID E
TEST
POINT
A
C TEST
POINT
24.3
V
A
DJ
SEE INST
A
LL
A
TION M
A
NU
A
LFORSERVICE
SSE MBLE D
IN ME
ICO
SG4-PS
C
A
UTION
V
OLT
A
GES IN E
X
CESS OF
150
V
OLTS
A
RE PRESENT
UNDER CO
V
ER
A
ND M
A
Y
BE PRESENT
A
FTER POWER
IS REMO
V
ED
24V adjust DC test point
Status LED
AC test pointEmbedded
signal cable
AC/DC cable
A single SG4-PS power supply provides 2.9 A at +24 VDC. You can use the test point on the top
panel to verify the output. A green LED on the top panel indicates that the power supply is
functioning properly. The power supply is factory calibrated for 24 VDC, and no output voltage
adjustment is required.
If the green LED is not illuminated, the power supply is not producing a 24VDC output. You can
use the AC test point on the top panel to determine if the unit is receiving an AC input. If no AC
is present, use the AC test point located on the power distribution board to verify that AC is
reaching the power supply.
Typical Power Supply Configuration
In a typical configuration, the SG4 is powered from housing Port 2 and may contain one or two
SG4-PS power supplies.
To power the node from Port 2:
1 Install a 20 A fuse in housing port 2.
2 Move jumper J8 to the left position.
3 Ensure fuse F3 (20 A):
is in place to direct AC to the other ports of the node.
is removed to disable AC from the rest of the node.