Motorola SG4-DRT-2X Instruções de Operação Página 66

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 108
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 65
3-38 Bench Setup and Operation
SG4000 Installation and Operation Manual
8
Apply power to the node (see Powering the Node in this section). Allow five to ten seconds
for the system self-diagnosis to complete.
9 Verify that the green LED (ON), located on the top panel of each transmitter, is illuminated
to confirm enable status. Refer to Section 4, “Modules,” for fault LED functions.
10 Measure the RF power at the test point on the top of each return path transmitter.
The 20 dB test point is located after the JXP pad location and indicates the level into the
transmitter.
11 Place the proper JXP pad into each transmitter pad facility to achieve the nominal total
power level of 5 dBmV at the test point.
12 Review return path system levels.
The transmitter is configured to drive the laser to the recommended level (+15 dBmV) when
the total combined power at the housing ports connected to each leg of the segmented return
board is approximately +28 dBmV.
13 Measure the optical power level at the DC test point using a multimeter.
The scaled voltage at this test point is 1.0 V/mW.
For more specific information regarding return path setup procedures, refer to the supplemental
document Return Path Level Selection, Setup, and Alignment Procedure.
Vista de página 65
1 2 ... 61 62 63 64 65 66 67 68 69 70 71 ... 107 108

Comentários a estes Manuais

Sem comentários